-
E-mail
1083568033@163.com
-
Phone
15931659359
-
Address
Liugezhuang Development Zone, Dacheng County
Hebei Huazhang Thermal Insulation Building Materials Co., Ltd. Sales Department
1083568033@163.com
15931659359
Liugezhuang Development Zone, Dacheng County
Construction advantages of 45 thick Huazhang B1 grade rubber sheet
Easy construction and installation,For the installation of pipelines,Can be installed together with the progress of pipeline installation. These advantages determine its prospects. Rubber insulation materials do have many advantages,Because it is green and environmentally friendly,low thermal conductivity,Good fire resistance. Closed bubble structure,Thin material used,The thickness of the space used is reduced by about two-thirds compared to other insulation materials. Long service life with weather resistance,anti-aging,Resistant to severe cold,Anti inflammatory fever,Anti drying,Moisture resistance,It also has UV resistance,Ozone resistant,25 years without aging,non-deforming,Features such as maintenance free service life. High end appearance,Neat and aesthetically pleasing with high elasticity,Smooth surface layer,soft texture,Even if installed in a bent pipe,three-way,Valves and other irregular components can be kept intact,aesthetic,Appearance does not require decoration,Even without a suspended ceiling, it can still maintain high-end quality.When installing rubber insulation boards, the following points should be noted:1. All cutting lines and joints need to be sealed and glued with special adhesive. When the adhesive is not too tight, it should be glued under slight pressure. After installation, all tees, elbows, valves, flanges, etc. must reach the design thickness When installing, the large pipe should be installed first, followed by the small pipe, then the elbow, the tee, then the straight pipe, and finally the valve and flange. When installing refrigeration equipment, the gaps at both ends of the rubber material and the gaps between the iron pipes should be glued together. 5. Do not install the machine during use and do not turn it on within two days of installation.

