-
E-mail
1083568033@163.com
-
Phone
15931659359
-
Address
Liugezhuang Development Zone, Dacheng County
Hebei Huazhang Thermal Insulation Building Materials Co., Ltd. Sales Department
1083568033@163.com
15931659359
Liugezhuang Development Zone, Dacheng County
Reinforced aluminum foil composite B1 grade self-adhesive rubber insulation board
Huazhang B1 grade rubber insulation board, please pay attention to the following points:1. All cutting lines and joints need to be sealed and glued with special adhesive. When the adhesive is not too tight, it should be glued under slight pressure. After installation, all tees, elbows, valves, flanges, etc. must reach the design thickness When installing, the large pipe should be installed first, followed by the small pipe, then the elbow, the tee, then the straight pipe, and finally the valve and flange. When installing refrigeration equipment, the gaps at both ends of the rubber material and the gaps between the iron pipes should be glued together. 5. Do not install the machine during use and do not turn it on within two days of installation. 6. The cut of the pipeline should be installed in an inconspicuous place, and the cut of the two pipes should be avoided as much as possible. In our daily life, installing rubber insulation boards has become increasingly common. After knowing the precautions for installing rubber insulation boards, we can install them ourselves in the future.
The general combination of thickness and length specifications for rubber insulation boards includesThere are several types of insulation materials, including 10mm/20m, 15mm/20m, 20mm/10m, 25mm/10m, and 30mm/10m. If there are special requirements and the outer diameter of the pipeline exceeds 89mm, it is recommended to use sheet metal, and the insulation material needs to be thicker than 25mm. Multiple layers of overlapping packaging should be used until the required thickness is reached. Common rubber insulation board sheets and pipes are mostly black, and special colors can be customized.


