Brief Introduction

Installation Instructions

Taking the four wire system as an example here ↓

1、 Installation steps for terminal pole:

Accessories: 1 terminal pole,2A universal base,2Base seat screwM5*504A composite insulator,4An insulator screwKA4*14.

1. Use2rootM5*50Secure the terminal pole to the universal base.

2. Insert the terminal rod insulator, adjust the distance between the insulators, and useKA4*14Secure the insulator with screws.

3. After the installation of all insulators is completed, cover the rainproof cap of the terminal pole, and the terminal pole is installed.

2、 Installation steps for load-bearing rods:

Accessories: 1 load-bearing rod,2A universal base,2Screw for the base seatM5*304A hemispherical insulator,4A screw for an insulatorKA4*14.

1. Use2rootM5*30Secure the terminal pole to the universal base.

2. Insert the load-bearing rod insulator, adjust the distance between the insulators, and useKA4*14Secure the insulator with screws.

3. After the installation of all insulators is completed, cover the rainproof cap of the load-bearing rod, and the installation of the load-bearing rod is completed.

3、 Installation steps for the middle pole:

Accessories: 1 middle rod,1A universal base,4Screw for the base seatM5*144A rotating cover insulator,2A fixed component.

1. Use2rootM5*14Secure the fixing components of the middle end rod to the universal base.

2. Insert the middle rod insulator, adjust the distance between the insulators, and rotate and tighten the insulators.

3. After all the edges are installed, cover the rainproof cap on the middle pole, and the middle pole is installed.