Explosion proof electrical control boxSuitable for flammable and explosive environments, let's take a look at the correct installation specifications for explosion-proof electrical control boxes.
1. The selection of motors for explosion-proof electrical control boxes is crucial, and the explosion-proof labeling of explosion-proof electrical control cabinets should be consistent with the explosion-proof level of the risk gas on site. When installing the explosion-proof electrical control cabinet, the silicone sealing ring inside the equipment where the cable is introduced should not be discarded, and the clamping nut should be tightened. All screws on the shell should be tightened without any looseness or deficiency;
2. The installation of explosion-proof electrical control box route refers to the assembly of electrical cabinets. In order to do a good job in installation work, it is necessary to master the basic installation information and professional knowledge, and be able to install more effectively;
3Explosion proof electrical control boxBefore installation, it is necessary to check whether the technical statistical data on the factory nameplate is consistent with the actual application conditions. All standard components should be checked for looseness. If there is looseness, it should be tightened in multiple ways. The internal and external grounding devices of the junction box must be excellent and reliable;
4. During installation, it is necessary to pass the cable over the sealing ring, metal material sealing ring, and clamp it with a clamping nut to ensure sealing and prevent the cable from loosening. Unused wiring ports should be sealed with sealing rings and metal gaskets in multiple ways to prevent leakage;
5Explosion proof electrical control boxThe cross-sectional area of the route with less wiring cannot be less than 1.6 square meters, and the current control circuit cannot be less than 2.3 square meters. If this benchmark is not met, the circuit must not be able to withstand high currents, the service life will be shortened, and it cannot meet its usage needs. Therefore, when selecting a route, it is necessary to choose based on the specifications and models to prevent the explosion-proof control box from not working properly.