-
E-mail
745546686@qq.com
-
Phone
13336041973
-
Address
South Gate, No. 15 Jiaqi Road, Xianlin Street, Yuhang District, Hangzhou City
Hangzhou Special Olympics Environmental Protection Technology Co., Ltd
745546686@qq.com
13336041973
South Gate, No. 15 Jiaqi Road, Xianlin Street, Yuhang District, Hangzhou City
Baike Special 1500W Distribution Cabinet Industrial Air Conditioning Dehumidification Integrated MachineThis integrated special dehumidification air conditioner is a self-developed product that cools cabinets. It is suitable for applications where the internal heat generation of cabinets is high, electronic devices inside are sensitive to environmental temperature, and internal and external isolation is required. This product has complete functions, high reliability, simple installation, can work immediately after power on, and does not require complex debugging.
Baike Special 1500W Distribution Cabinet Industrial Air Conditioning Dehumidification Integrated MachineTechnical Specifications:
type |
name |
unit |
parameter |
|
Size and Installation |
Overall dimensions(Height * Width * Depth) |
mm |
746*446*200 |
weight |
Kg |
24 |
|
Installation method |
Door decoration |
||
Installation environment |
outdoor |
||
|
Environment and Protection |
Working environment temperature |
℃ |
-40 to+55 |
noise |
dB(A) |
65 |
|
Protection level |
IP55 |
||
refrigerant |
R134a |
||
|
performance |
Power supply range |
220±15%VAC/50Hz |
|
refrigeration capacity |
W |
1500 |
|
rated power |
W |
580 |
|
heating capacity(Optional) |
W |
1000 |
|
Installation Diagram

Attention: The installation diagram is for reference only, and the specific operation should be determined according to the actual usage environment.







Encyclopedia Special Olympics Cabinet Air Conditionerinstall
Unpacking and inspection
1. Prepare tools for unpacking: blades, scissors, and wear protective gloves;
2. Remove the wrapping film and packaging tape, then remove the paper packaging and take out the air conditioner.
3. Check the packing list and accessory packages inside the packaging to confirm if the air conditioning model inside the packaging box meets the requirementsrequirement.
Note:
4. After unpacking, please ensure that the air conditioner is placed upright and cannot be placed flat or upside down.
5. After unpacking, please carefully inspect the appearance of the air conditionerWhether there is damage or oil contamination. If there is obvious deformation or oil stains on the appearance of the air conditioner, please contact us promptly Contact the manufacturer.
6. If the product is not installed immediately or needs to be transported to other areas, please repackage the air conditioner after inspection.
7. Suggest recycling the dismantled packaging materials.