-
E-mail
1004233156@qq.com
-
Phone
13852565969
-
Address
Baoying Chengnan Industrial Zone
Yangzhou Guohua Electric Co., Ltd
1004233156@qq.com
13852565969
Baoying Chengnan Industrial Zone
I. Overview
Fully automatic cable thermal connectorIn the hot repair work of rubber sheathed cables, it is most suitable for repairing and marking cables in coal mines, iron mines, drilling and well construction.This machine is made of alloy aluminum for the box and mold, with hydraulic clamping for temperature indication by instruments. Effortless, energy-saving, reliable operation, high work efficiency, easy maintenance, and guaranteed repair quality. The repaired cable has a smooth, flat appearance, firm adhesion, and pressure resistant sealing, so this machineIt's a cableHot repair equipment.
2、 Main technologies
Working voltage: 220V
Heating power: 4-8kw
Repair cable diameter: 5-1000mm
Mold closing pressure: 5T
Mold heating: adjustable from 0-300 ℃
Repair length: 400-1200mm
Dimensions: 1100 × 450 × 1000mm
Working face height: 750mm
Note: Specific parameters are subject to the actual product
Customized according to user requirements
IIIFully automatic cable thermal connectorStructure Introduction
The fully automatic temperature controlled cable hot repair machine mainly consists of a bracket, electrical system, hydraulic system, and instrument control panel. The hydraulic system mainly consists of hydraulic cylinders, pistons, valves, and pressure rods, which complete the lifting and pressurization of the mold to ensure the pressure required for the heating and bonding process; The bracket is the main component of the hot repair machine, composed of welded steel sections, and equipped with a walking mechanism, toolbox, and counterweight iron to form a complete unified machine. It is easy to move during operation, and the electrical heating system is assembled separately and controlled uniformly. It is equipped with temperature and light indicator devices, forming a good adjustment and control performance.
4、 Detecting cable damage
This process is developed for the repair of rubber sheathed cables.
Firstly, conduct a pressure test on the cable. If it is found that the voltage of the cable does not meet the required voltage, it indicates that the insulation layer of the cable is damaged and must be repaired before use. (If leakage is already found during use, there is no need to conduct a pressure test again and repair can be carried out directly.).
Secondly, clip one end of the cable that needs to be repaired into the junction box of the cable dryer for inflation. If there is obvious damage, a "wheezing" sound will soon be detected. At this time, mark the location of the wheezing for repair; If there is no obvious gas leakage, brush the suspected damaged part of the cable with soapy water. If there are bubbles, it indicates that the part is leaking. Mark the area and check the cable again. If any leaks are found, repair them until they are fixed.

